
Henan fire door selection method Fire door is particularly important as a family fire protection, but when you buy low-quality fire door, the fire door is no longer fireproof, what should you do? Our city's fire department investigated and destroyed a batch of inferior fire doors with honeycomb paper instead of fireproof filler materials. Here, the firefighters introduced some tips on how to choose and purchase high-quality fire doors. According to the regulations, steel and wood fire doors can be divided into Class A, Class B and Class C according to the fire resistance limit. The fire resistance limit requirements are 90 minutes, 60 minutes and 30 minutes respectively. In addition, the wood used to make wood fire doors needs drying and flame retardant treatment, and the hardware used must also be fire hardware. high quality Refuge bay door There are five ways to choose high-quality fire doors: one is to check the appearance, high-quality steel fire doors are firmly welded, and the welding spots are evenly distributed; The external surface shall be sprayed flat and smooth; There shall be product mark, quality inspection mark and quality certification (approval) mark at the specified position. Refuge bay door direct deal The qualified wooden fireproof door shall be intact without damage, and the surface shall be clean without plane marks, burrs and hammer marks; Corner cutting and butt joint shall be tight and flat. The second way is to check the figures. The overall dimensions of qualified products should be less than or equal to the overall dimensions in the sample description, the door leaf thickness should be greater than or equal to the door leaf thickness in the sample description, the door frame sidewall width should be greater than or equal to the door frame sidewall width in the sample description, and the overall dimensions of fire-resistant glass should be less than or equal to the overall dimensions of fire-resistant glass in the sample description, The thickness of fireproof glass shall be equal to or greater than the thickness of fireproof glass in the sample description.

The operation method of Henan fire doors is recognized by the laboratory of the Ministry of Economy of the Ministry of Fire Protection. According to the new version of the standard for fire doors GB_12955-2008 implemented on January 1, 2009, those who pass the fire resistance test method of fire doors and obtain the registration certificate and authorization mark issued by the Bureau of Standards and Inspection of the Ministry of Economy are called fire doors. high quality Refuge bay door The fire door defined in the American NFPA and IBC codes is "the combination of any fire door leaf, door frame, hardware and other accessories that can jointly provide a certain degree of fire protection at the opening." Operation method Henan fire door widely carries out publicity and education on the use, maintenance and management of fire prevention facilities within the jurisdiction of the fire department in charge, Efforts should be made to improve people's awareness of fire protection and self-protection; Extensive publicity, education and training on fire protection and umbrella protection knowledge shall be carried out for units installed with fire door maintenance, so as to make every employee understand the basic knowledge of the use, maintenance and management of fire door maintenance, and consciously participate in the maintenance and management of the Gate of Life, so as to keep them in a state of combat readiness at all times; The fire door maintenance purpose, function and good use status and basic requirements for use shall be posted on the fire door maintenance, and the words "normally closed fire door maintenance, please close at any time" shall be written on the conspicuous position of the normally closed fire door maintenance, so that customers and the masses can understand the basic knowledge of fire door maintenance. Refuge bay door direct deal Carry out publicity activities to protect fire-fighting facilities and equipment, and mobilize everyone to participate in the protection of fire-fighting facilities such as fire door maintenance.

Relevant requirements for fire protection of the door of Henan Refuge Room What kind of products are qualified when the door of Henan Refuge Room passes the fire protection? Here are some examples: 1. Filling materials: the filling materials must meet the requirements of combustion performance A1 specified in GB8624-2006. At the same time, it meets the requirements of smoke toxicity hazard classification ZA2 specified in GB/T20285-2006. 2. Material thickness: door leaf material shall be no less than 0.8mm, door panel material shall be no less than 0.8mm, door frame plate shall be no less than 1.2mm, hinge plate shall be no less than 3.0mm, reinforcement without screw holes shall be no less than 1.2mm, and reinforcement with screw holes shall be no less than 3.00mm. high quality Refuge bay door The door of Henan refuge room 3. The adhesive shall meet the requirements of smoke toxicity hazard classification ZA2 specified in GB/T20285-2006. 4. Dimensional deviation: the height of the door leaf shall not exceed 2mm, the width of the door leaf shall not exceed 2mm, the thickness of the door leaf shall be between - 1mm and+2mm, the height of the clipping opening in the door frame shall not exceed 3mm, the width of the clipping opening in the door frame shall not exceed 2mm, and the width of the side wall of the door frame shall not exceed 2mm. 5. Geometric tolerance: the length difference between the two diagonals of the door leaf shall be less than or equal to 3mm, The distortion of the door leaf shall be less than or equal to 5mm, the curvature of the door leaf in the width direction shall be less than 2%, the curvature of the door leaf in the height direction shall be less than 2%, and the length difference between the two diagonals of the inner cutting opening shall be less than or equal to 3mm. 6. Fit tolerance: the overlap size between Manshan and the door frame is less than or equal to 12mm, the fit clearance between the door leaf and the door frame at the hinge side shall not be greater than the size tolerance specified in the design drawing, and the fit clearance between the door leaf and the door frame at the lock side shall not be greater than the size tolerance specified in the design drawing. Refuge bay door direct deal The clearance between the door leaf and the upper frame shall be less than or equal to 3mm, the clearance between the double leaf and multi leaf door leaves shall be less than or equal to 3mm, the clearance between the door leaf and the lower frame or the ground shall be less than or equal to 9mm, the clearance between the binding surface of the door leaf and the side of the door frame with hinges shall be less than or equal to 3mm, the clearance between the binding surface of the door leaf and the side of the door frame with locks shall be less than or equal to 3mm, and the clearance between the binding surface of the door leaf and the upper frame of the door frame shall be less than or equal to 3mm, The plane height difference between the door frame and the door leaf is less than or equal to 1mm.

Henan fire rolling shutter door is generally installed in the place determined by the process. In addition to the firewall, the fire rolling shutter door should be installed in the two fire compartments where there is no firewall. It is generally located at the following parts. (1) Close the evacuation staircase to the walkway; Enclose the elevator hall, the door leading to the front room and the front room leading to the walkway. (2) Divide the fire compartment and control the fire wall and the door on the fire partition in the building area of the compartment. When it is difficult to set firewall or fire door in the building, fire rolling shutter door shall be used instead, and water curtain shall be used for protection. (3) Code (such as GB50045-95 Code for Fire Protection Design of High rise Civil Buildings) or partition door with special requirements for fire and smoke prevention. high quality Refuge bay door For example, the partition doors of equipment rooms (cylinder rooms, foam stations, etc.) attached with fixed fire extinguishing devices in high-rise civil buildings, ventilation, air conditioning rooms, etc. should be Class A fireproof doors; The door on the partition wall of the basement room where people often stay or there are many combustibles shall be Class A fireproof door; Due to limited conditions, it is necessary to arrange oil fired and gas-fired boilers, oil immersed power transformers, high voltage capacitors and switches filled with oil, etc. in high-rise buildings. The doors on the partition walls of special rooms should be Class A fireproof doors. There are also household doors with special requirements that must be fireproof, such as fire control command center, archives room, valuables warehouse, etc., which usually use Class A or Class B fireproof doors. Refuge bay door direct deal The limited area of Henan fire shutter door special grade fire shutter In the use of special grade fire shutter, because it is mainly used in the rapid formation of fire separation areas, and is mostly set in applications with large space, as a visible fire separation device, generally in the production of fire shutter, fire shutter will be painted with a more striking color, It can not only make the fireproof rolling shutter have a better decorative effect after being folded, but also can remind people of the escape route in fire accidents through eye-catching and penetrating colors in the fire compartment, so as to buy time for effective escape.

Henan fireproof rolling shutter door maintenance common faults and treatment methods The fireproof rolling shutter door is constantly applied to large supermarkets, shopping malls, underground garages, workshops and other crowded places. It is inevitable that there will be some small problems that need to be solved. I summarize a few points for your reference. 1、 The fire shutter door does not act: first, check the power supply to see if the power supply air switch of the fire shutter door has power. If there is no power, check the power supply. If there is power, the power indicator of the roller shutter control box should be green at this time. high quality Refuge bay door If the indicator light is not on, then we should check whether the transformer in the control box (the resistance of the transformer is 270 ohms) is burned out. If the power indicator flashes green, it indicates that the power supply may be out of phase. If the power supply is not out of phase, it may be that the standby power board of the control box is burned out; It is also possible that both the power board and the standby power board are burned out. 2、 Henan fire shutter door power supply air switch cannot be pushed up: when delivering the gate, the air switch cannot be pushed up, first check whether there is a problem with the standby board, and the resistance of the output line of the standby board is about 300 ohms. In case of open circuit or short circuit, check whether the motor brake is burnt or whether the spare board is burnt. 3、 The operation button does not work properly: you should first press the Stop key, then press the Reset key, and then press the Up and Down keys. 4、 The indicator lights of the power control box or button panel are all on: at this time, first check whether there is a short circuit in the button line or a button may be pressed to death. If the above phenomenon does not exist, it may be that the chip on the power main board is broken, and then replace the chip. Refuge bay door direct deal Pay attention to wearing the clothes in reverse (that is, the opening faces the opening).

Control Procedure for Internal Quality Management System of Henan Refuge Room Door Manufacturer 1. Purpose To conduct regular internal quality audits to verify the quality activities and related results. Stone composite procedure documents: CCCF-HZFH-02 (A/O) Rules for the Implementation of Compulsory Product Certification, Fire Protection Products, Fire Resistant Components of Buildings and other quality documents, and take corrective measures in a timely manner, So as to make the quality management system operate effectively and ensure that the product consistency meets the requirements of relevant approval rules. 2. The scope is applicable to the audit of our internal quality management system. 3. Responsibilities: The quality director shall lead the internal quality audit work, and the audit team leader shall organize the internal quality audit work under the centralized management of the office, with the cooperation of each department. Henan Refuge Room 4. Procedure (1) Audit frequency The internal quality management system of each department shall be audited at least once a year according to the following procedures. high quality Refuge bay door In case of major quality accident or other special reasons, the quality director shall decide to conduct targeted additional audit. (2) The Audit Planning Office shall propose the "Annual Internal Quality Management System Audit Plan" every year according to the actual situation and importance of audit activities, which shall be approved and implemented by the quality director. (3) Auditors The auditors shall have the qualification of internal auditors and have no direct responsibility for the audited activities, and shall be appointed by the General Manager. For the temporary additional audit, the quality director shall specify the audit team leader and auditors. (4) Before each audit, the office shall prepare the "audit schedule plan", which shall be approved by the person in charge of quality. The audit team leader reviews the documents and assigns tasks to the auditors, who prepare the audit checklist. (5) Audited department and audit schedule; Purpose, scope and basis of audit; Audit content and specific time arrangement; Division of auditors, etc. Refuge bay door direct deal The audit schedule shall be sent by the audit team leader to the audited department one week in advance. After receiving the audit schedule, the audited department can notify the audit team leader in advance if there is any objection. After negotiation, it can make appropriate adjustments.