
Control Procedure for Internal Quality Management System of Henan Refuge Room Door Manufacturer 1. Purpose To conduct regular internal quality audits to verify the quality activities and related results. Stone composite procedure documents: CCCF-HZFH-02 (A/O) Rules for the Implementation of Compulsory Product Certification, Fire Protection Products, Fire Resistant Components of Buildings and other quality documents, and take corrective measures in a timely manner, So as to make the quality management system operate effectively and ensure that the product consistency meets the requirements of relevant approval rules. 2. The scope is applicable to the audit of our internal quality management system. 3. Responsibilities: The quality director shall lead the internal quality audit work, and the audit team leader shall organize the internal quality audit work under the centralized management of the office, with the cooperation of each department. Henan Refuge Room 4. Procedure (1) Audit frequency The internal quality management system of each department shall be audited at least once a year according to the following procedures. high quality anti-theft door In case of major quality accident or other special reasons, the quality director shall decide to conduct targeted additional audit. (2) The Audit Planning Office shall propose the "Annual Internal Quality Management System Audit Plan" every year according to the actual situation and importance of audit activities, which shall be approved and implemented by the quality director. (3) Auditors The auditors shall have the qualification of internal auditors and have no direct responsibility for the audited activities, and shall be appointed by the General Manager. For the temporary additional audit, the quality director shall specify the audit team leader and auditors. (4) Before each audit, the office shall prepare the "audit schedule plan", which shall be approved by the person in charge of quality. The audit team leader reviews the documents and assigns tasks to the auditors, who prepare the audit checklist. (5) Audited department and audit schedule; Purpose, scope and basis of audit; Audit content and specific time arrangement; Division of auditors, etc. anti-theft door direct deal The audit schedule shall be sent by the audit team leader to the audited department one week in advance. After receiving the audit schedule, the audited department can notify the audit team leader in advance if there is any objection. After negotiation, it can make appropriate adjustments.

Thickness requirements and guide rail problems of Henan fire rolling shutter door For the fire rolling shutter door itself, we will actually notice that it is actually a kind of common fire prevention equipment in buildings, and the thickness of the roller shutter on the fire rolling shutter door in Henan. high quality anti-theft door First of all, as for the thickness of the curtain, it actually refers to the thickness of a steel plate used for the curtain, which is actually used in practice. In terms of the current form of Henan fire shutter door, for some manufacturers of Henan fire shutter door, there will be a series of problems of jerry building. For many manufacturers, we will actually notice that when they test, they use qualified steel plates, but when they produce, In fact, the steel plate used is relatively thin. When installing this kind of roller shutter, it is not convenient to measure its thickness, so many unqualified products are easy to muddle through. anti-theft door direct deal In this respect, for the materials on the fire shutter door, the fire shutter itself will not meet the requirements. At this time, it will actually reduce its service life and fire resistance time to a certain extent.

The role of Henan fire doors in fire protection We often see on the ground of some large or local places that no one is allowed to stand under the fire facilities or shelves are placed. high quality anti-theft door Then, the primary use of assembling fire doors is that if a fire occurs in a certain place, the rolling shutter door can stop the extension of the fire when it is put down. Usually, the fire doors in such large buildings have automatic central control systems. Once a fire occurs, you can automatically implement a series of behaviors, and the fire doors will automatically lower the fire. The following is the employment process of the automatic control system of the fire door. When a fire occurs, the smoke sensor installed on the roof receives the flag of the smoke and alarms to the central control system. After identification, the control system of the fire center connects the power supply of the fire door in the fire alarm location area, so that the fire shutter in the fire area will fall to the ground at the required rate. When the roller shutter passes to a position about 1.5 meters above the ground, stop the activity, so as to facilitate the evacuation and evacuation of employees on site. After the associated employees withdraw together, the fire door will continue to go down until it is closed. The descending rate of the fire door and the time of stay during the period can be adjusted according to the number of employees. anti-theft door direct deal It is not only such places that are equipped with fire doors, but also in some staircases, corridors and other places. Since fire is rarely generated and some fire prevention settings are easy to use, the conditions must be inspected regularly by dedicated staff.

Henan fireproof door is generally set in the following parts. (1) Close the evacuation staircase to the walkway; Enclose the elevator hall, the door leading to the front room and the front room leading to the walkway. (2) Inspection doors of vertical pipe shafts such as cable shafts, pipe shafts, smoke exhaust ducts, garbage ducts, etc. Henan fire door (3) divides the fire compartment, controls the fire wall and the door on the fire partition of the building area of the compartment. high quality anti-theft door When it is difficult to set firewall or fire door in the building, fire rolling shutter door shall be used instead, and water curtain shall be used for protection. (4) Code (such as GB50016-2014 Code for Fire Protection Design of Buildings) or partition door with special requirements for fire and smoke prevention. For example, the partition doors of equipment rooms (cylinder rooms, foam stations, etc.) attached with fixed fire extinguishing devices in high-rise civil buildings, ventilation, air conditioning rooms, etc. should be Class A fireproof doors; The door on the partition wall of the basement room where people often stay or there are many combustibles shall be Class A fireproof door; Due to limited conditions, it is necessary to arrange oil fired and gas-fired boilers, oil immersed power transformers, high voltage capacitors and switches filled with oil, etc. in high-rise buildings. The doors on the partition walls of special rooms should be Class A fireproof doors. anti-theft door direct deal There are also household doors with special requirements that must be fireproof, such as fire control command center, archives room, valuables warehouse, etc., which usually use Class A or Class B fireproof doors. Fire and burglar proof doors are often used as household doors in high-rise and high-grade residential buildings. GB 12955-2008 Requirements for Fire Resistance of Fire Doors Fire doors are an important part of fire fighting equipment and an important part of social fire prevention. Fire doors should be equipped with fire door closers or door closers that allow normally open fire doors to automatically close the door leaves in case of fire (except for special parts, such as pipeline shaft doors, etc.). That is to say, except for some special parts, such as pipeline well doors, which do not need to install door closers, other parts need to install fire door closers.