
What is the difference between the normally open and normally closed fire doors of Henan fire doors? The differences between the normally open and normally closed fire doors are as follows: 1. Different meanings. The normally open fire doors are usually open, and they are automatically closed by the control system only in case of fire. It is generally used in the passage or corridor of public places. major Steel Grade A fireproof door Normally closed fire doors are closed under normal conditions and in case of fire, and need to be pushed open when someone walks around, so as to prevent smoke and fire and prevent the spread of fire. 2. The price is different, and the price of the normally open fire door is higher, and the system is strong. The price of normally closed fire doors is relatively low. Henan fireproof doors and windows 3. The composition is different. The normally open fireproof door consists of door leaf, door frame, door closer, sealing strip, release switch and other parts. The normally closed fireproof door is equipped with sequencer in addition to the above parts. 4. The control mode is different. The normally open fire door is controlled by the fire door release switch. The normally closed fire door does not need to be set with electric automatic control. It is mainly closed by the door closer and sequencer, that is, mechanical. Precautions for Henan fire door fire door 1. The fire door shall be installed according to the type of fire door used, and the appropriate installation method shall be adopted. 2. The door frame of the fire door can be fixed with the wall by expansion bolts, or iron parts can be embedded at the opening when building the wall, and welded firmly with the door frame connector during installation. 3. No matter what kind of connection mode is used between the door frame and the wall, there should be no less than 3 anchor points on each side, and they should be firmly connected. Henan fireproof doors and windows 4. When installing the fireproof door, it should be aligned and hoisted. After the size is appropriate, it should be temporarily fixed, corrected and adjusted, and then it can be connected and anchored. 5. The sliding door shall be flexible after installation; The side hung door is easy to open and tight and firm to close. Steel Grade A fireproof door Manufacturer Henan fireproof doors and windows 6. Door closers must be installed on fireproof doors, and sequencers must be installed on opposite doors. 7. The handle, fire lock and other hardware accessories on the fire door must be complete. 8. It is required that the clearance from the ground plane shall not be greater than 5mm.

The conditions for the developer of the Henan Refuge Room Door to deliver the house must be met when delivering the house in the new fire prevention code: legal conditions: 1. The developer should provide the Construction Project Completion Filing Form, household acceptance form, area report measurement report and indoor environment inspection report; the real estate development enterprise should obtain the Construction Project Completion Acceptance Filing Form when delivering the pre-sale commercial house; Obtain the technical report on the actual measurement of commercial housing area; Meet other delivery conditions agreed in the pre-sale contract. 2. The developer shall provide the Housing Quality Assurance Certificate and the Housing Operation Manual: the developer must provide the above two books when delivering the new commercial residential buildings for sale. major Steel Grade A fireproof door If the developer cannot provide any of the above materials, the owner has the right to refuse to accept the house. Steel Grade A fireproof door Manufacturer Agreed conditions: 1. According to the house purchase contract, the developer shall fulfill the delivery commitment for water supply, power supply, heat supply, gas, communication, roads, greening and other supporting facilities when delivering the house, otherwise, the owner has the right to refuse to accept the house. 2. Other conditions agreed in the housing contract

Relevant requirements for fire protection of the door of Henan Refuge Room What kind of products are qualified when the door of Henan Refuge Room passes the fire protection? Here are some examples: 1. Filling materials: the filling materials must meet the requirements of combustion performance A1 specified in GB8624-2006. At the same time, it meets the requirements of smoke toxicity hazard classification ZA2 specified in GB/T20285-2006. 2. Material thickness: door leaf material shall be no less than 0.8mm, door panel material shall be no less than 0.8mm, door frame plate shall be no less than 1.2mm, hinge plate shall be no less than 3.0mm, reinforcement without screw holes shall be no less than 1.2mm, and reinforcement with screw holes shall be no less than 3.00mm. major Steel Grade A fireproof door The door of Henan refuge room 3. The adhesive shall meet the requirements of smoke toxicity hazard classification ZA2 specified in GB/T20285-2006. 4. Dimensional deviation: the height of the door leaf shall not exceed 2mm, the width of the door leaf shall not exceed 2mm, the thickness of the door leaf shall be between - 1mm and+2mm, the height of the clipping opening in the door frame shall not exceed 3mm, the width of the clipping opening in the door frame shall not exceed 2mm, and the width of the side wall of the door frame shall not exceed 2mm. 5. Geometric tolerance: the length difference between the two diagonals of the door leaf shall be less than or equal to 3mm, The distortion of the door leaf shall be less than or equal to 5mm, the curvature of the door leaf in the width direction shall be less than 2%, the curvature of the door leaf in the height direction shall be less than 2%, and the length difference between the two diagonals of the inner cutting opening shall be less than or equal to 3mm. 6. Fit tolerance: the overlap size between Manshan and the door frame is less than or equal to 12mm, the fit clearance between the door leaf and the door frame at the hinge side shall not be greater than the size tolerance specified in the design drawing, and the fit clearance between the door leaf and the door frame at the lock side shall not be greater than the size tolerance specified in the design drawing. Steel Grade A fireproof door Manufacturer The clearance between the door leaf and the upper frame shall be less than or equal to 3mm, the clearance between the double leaf and multi leaf door leaves shall be less than or equal to 3mm, the clearance between the door leaf and the lower frame or the ground shall be less than or equal to 9mm, the clearance between the binding surface of the door leaf and the side of the door frame with hinges shall be less than or equal to 3mm, the clearance between the binding surface of the door leaf and the side of the door frame with locks shall be less than or equal to 3mm, and the clearance between the binding surface of the door leaf and the upper frame of the door frame shall be less than or equal to 3mm, The plane height difference between the door frame and the door leaf is less than or equal to 1mm.

Analysis on the influence of fire resistance time of henan fire rolling shutter door on the coming of fire hazard in building fire protection design, ensuring safe evacuation of personnel is the primary premise of fire protection design, and the important standard of fire safety evacuation is time. major Steel Grade A fireproof door China has made detailed regulations on the setting of evacuation width, evacuation distance, various fire-fighting facilities and other elements in various fire technical specifications. These are hard standards for fire design and review, but in fact, these requirements are not isolated from each other and created out of thin air. They all serve to ensure the safe evacuation of people, The setting requirements in the specification mostly come from the calculation of the fire safety evacuation time, so understanding the fire safety evacuation time is the basis and premise for the design and installation of fire rolling shutter doors. The so-called safe evacuation of Henan fire shutter door refers to the evacuation of people to a safe area before the fire develops to threaten the safety of people, that is, to make the safe evacuation time less than the time of danger, which is the benchmark of evacuation design, and all other design elements should serve this goal. The main factors that can cause danger to people in fire are high temperature, toxic smoke, building structure collapse and so on. The high temperature is mainly caused by thermal convection and radiation. When the air temperature reaches 100 ℃, ordinary people can only endure it for more than 10 minutes. When the temperature exceeds 200 ℃, people will die within 5 minutes. The harmful gases in the smoke mainly include carbon monoxide, carbon dioxide, formaldehyde, acetaldehyde, hydrogen cyanide, etc. The common carbon monoxide content in the air as long as 1%, people will lose consciousness after breathing several times, which will lead to death. At present, a large number of polyethylene, polystyrene and other building materials will produce toxic smoke after combustion. Smoke will not only cause poisoning, but also reduce the visibility of people in dense smoke due to the dimming effect of smoke. When the visibility is less than 0.5m, the moving speed of people is equivalent to the walking speed when they lose their vision. Steel Grade A fireproof door Manufacturer Henan fireproof rolling shutter door usually has a fire resistance limit much higher than the time of smoke spreading and flowing, but if flammable and combustible decoration materials are used in the evacuation passageway, it may also burn rapidly.

Control Procedure for Internal Quality Management System of Henan Refuge Room Door Manufacturer 1. Purpose To conduct regular internal quality audits to verify the quality activities and related results. Stone composite procedure documents: CCCF-HZFH-02 (A/O) Rules for the Implementation of Compulsory Product Certification, Fire Protection Products, Fire Resistant Components of Buildings and other quality documents, and take corrective measures in a timely manner, So as to make the quality management system operate effectively and ensure that the product consistency meets the requirements of relevant approval rules. 2. The scope is applicable to the audit of our internal quality management system. 3. Responsibilities: The quality director shall lead the internal quality audit work, and the audit team leader shall organize the internal quality audit work under the centralized management of the office, with the cooperation of each department. Henan Refuge Room 4. Procedure (1) Audit frequency The internal quality management system of each department shall be audited at least once a year according to the following procedures. major Steel Grade A fireproof door In case of major quality accident or other special reasons, the quality director shall decide to conduct targeted additional audit. (2) The Audit Planning Office shall propose the "Annual Internal Quality Management System Audit Plan" every year according to the actual situation and importance of audit activities, which shall be approved and implemented by the quality director. (3) Auditors The auditors shall have the qualification of internal auditors and have no direct responsibility for the audited activities, and shall be appointed by the General Manager. For the temporary additional audit, the quality director shall specify the audit team leader and auditors. (4) Before each audit, the office shall prepare the "audit schedule plan", which shall be approved by the person in charge of quality. The audit team leader reviews the documents and assigns tasks to the auditors, who prepare the audit checklist. (5) Audited department and audit schedule; Purpose, scope and basis of audit; Audit content and specific time arrangement; Division of auditors, etc. Steel Grade A fireproof door Manufacturer The audit schedule shall be sent by the audit team leader to the audited department one week in advance. After receiving the audit schedule, the audited department can notify the audit team leader in advance if there is any objection. After negotiation, it can make appropriate adjustments.