
Whether Henan fireproof door should be made of wood or steel? I think that many people's understanding of wooden fireproof door is still in the process of questioning whether wooden fireproof door can be safe against fire. There is no need to talk about whether steel fireproof door or wooden fireproof door is better. Usually people subconsciously think that steel fireproof door is better than wooden fireproof door. supply Steel Grade A fireproof door According to the Code for Construction Quality Acceptance of Decoration Engineering? GB50210-2001? As far as wood fire doors are concerned, they belong to special doors. Therefore, wood fire doors can not only provide fire safety, but also are widely used in various industrial buildings and some public buildings because of their elegant appearance design, convenient installation and good decorative arts. But it is also beautiful and generous. In the final analysis, what about the wooden fire door with fire safety characteristics? Which is better, steel fire door or wood fire door? Let's have a look at their advantages and differences: wooden fireproof doors refer to those doors whose fire resistance rating exceeds the requirements of GB50045-95? Code for Fire Protection Design of High rise Residential Industrial Buildings with wood or wood handicrafts as door frames, door frame framework drawings, door frame control panels. Steel Grade A fireproof door Price Wooden fireproof doors are divided into full panel and half glass series products, as well as specifications and models of single and double leaves.

Henan fireproof rolling shutter door is developing rapidly. Henan fireproof rolling shutter door style and measurement design considerations. The fireproof rolling shutter door is widely used in commercial buildings, workshops and underground garages. The specific installation standards are as follows: measurement design: step one: general classification of roller shutter installation. Self inspection of fire shutter: manual operation mode: whether a circular iron chain set in the storage box at one side of the shutter can be found to operate the lowering and rolling. supply Steel Grade A fireproof door When the installation form is wall side installation: when there are embedded parts (steel plates) in the building, after cleaning the installation datum plane, check and verify whether the size and external position of the embedded parts are suitable for the installation drawing design. If the design requirements are appropriate, this is the datum plane for the installation of large and small supports. Steel Grade A fireproof door Price The facing bricks around the wall projections shall be cut and matched with the whole brick, and the edges shall be clean. (Check the date of delivery and the date of maintenance; carbon dioxide, dry powder and clean gas extinguishers are outdated if they have been delivered for 5 years or maintained for 2 years; foam extinguishers are outdated if they have been delivered for 3 years or maintained for 1 year, and they need to be sent to the fire extinguisher factory or professional maintenance unit for maintenance). Henan fireproof rolling shutter door After the Henan fireproof rolling shutter door is installed, the ceiling edge should be 50mm away from the curtain plate to avoid friction; c. The foundation dimensions of rolling shutter doors and parts shall be measured, which shall be consistent with the requirements of the design institute.

Henan fireproof rolling shutter door maintenance common faults and treatment methods The fireproof rolling shutter door is constantly applied to large supermarkets, shopping malls, underground garages, workshops and other crowded places. It is inevitable that there will be some small problems that need to be solved. I summarize a few points for your reference. 1、 The fire shutter door does not act: first, check the power supply to see if the power supply air switch of the fire shutter door has power. If there is no power, check the power supply. If there is power, the power indicator of the roller shutter control box should be green at this time. supply Steel Grade A fireproof door If the indicator light is not on, then we should check whether the transformer in the control box (the resistance of the transformer is 270 ohms) is burned out. If the power indicator flashes green, it indicates that the power supply may be out of phase. If the power supply is not out of phase, it may be that the standby power board of the control box is burned out; It is also possible that both the power board and the standby power board are burned out. 2、 Henan fire shutter door power supply air switch cannot be pushed up: when delivering the gate, the air switch cannot be pushed up, first check whether there is a problem with the standby board, and the resistance of the output line of the standby board is about 300 ohms. In case of open circuit or short circuit, check whether the motor brake is burnt or whether the spare board is burnt. 3、 The operation button does not work properly: you should first press the Stop key, then press the Reset key, and then press the Up and Down keys. 4、 The indicator lights of the power control box or button panel are all on: at this time, first check whether there is a short circuit in the button line or a button may be pressed to death. If the above phenomenon does not exist, it may be that the chip on the power main board is broken, and then replace the chip. Steel Grade A fireproof door Price Pay attention to wearing the clothes in reverse (that is, the opening faces the opening).

The installation of Henan fire rolling shutter door is prone to some problems. One problem is the strength of the transmission device of the fire rolling shutter door. The strength of the roller shutter shaft is also an important parameter of the roller shutter door. At present, there are many unqualified products with this strength, The structure of the roller shutter shaft that seriously affects the use of the fire shutter door mainly refers to the depth of the roller shutter shaft and the shaft heads at both ends plugged into the steel pipe and the depth of the structural shaft head plugged into the steel pipe should be about 110 of the shaft length, and there should be two flanges and enough welds. supply Steel Grade A fireproof door The second problem is the depth of the guide rail. If the depth of the guide rail is not enough and the structure and materials are improper, once encountering a fire, the door curtain is easy to detach from the guide rail and cannot play a role in fire prevention. Steel Grade A fireproof door Price The third problem is the pre rolling of the fire rolling shutter door. The fire rolling shutter door, especially the steel fire rolling shutter door, is relatively heavy, so a circle of pre rolling will be reserved on the reel to reduce the tension of the curtain weight on the screws. Prevent a curtain from cracking.

Control Procedure for Internal Quality Management System of Henan Refuge Room Door Manufacturer 1. Purpose To conduct regular internal quality audits to verify the quality activities and related results. Stone composite procedure documents: CCCF-HZFH-02 (A/O) Rules for the Implementation of Compulsory Product Certification, Fire Protection Products, Fire Resistant Components of Buildings and other quality documents, and take corrective measures in a timely manner, So as to make the quality management system operate effectively and ensure that the product consistency meets the requirements of relevant approval rules. 2. The scope is applicable to the audit of our internal quality management system. 3. Responsibilities: The quality director shall lead the internal quality audit work, and the audit team leader shall organize the internal quality audit work under the centralized management of the office, with the cooperation of each department. Henan Refuge Room 4. Procedure (1) Audit frequency The internal quality management system of each department shall be audited at least once a year according to the following procedures. supply Steel Grade A fireproof door In case of major quality accident or other special reasons, the quality director shall decide to conduct targeted additional audit. (2) The Audit Planning Office shall propose the "Annual Internal Quality Management System Audit Plan" every year according to the actual situation and importance of audit activities, which shall be approved and implemented by the quality director. (3) Auditors The auditors shall have the qualification of internal auditors and have no direct responsibility for the audited activities, and shall be appointed by the General Manager. For the temporary additional audit, the quality director shall specify the audit team leader and auditors. (4) Before each audit, the office shall prepare the "audit schedule plan", which shall be approved by the person in charge of quality. The audit team leader reviews the documents and assigns tasks to the auditors, who prepare the audit checklist. (5) Audited department and audit schedule; Purpose, scope and basis of audit; Audit content and specific time arrangement; Division of auditors, etc. Steel Grade A fireproof door Price The audit schedule shall be sent by the audit team leader to the audited department one week in advance. After receiving the audit schedule, the audited department can notify the audit team leader in advance if there is any objection. After negotiation, it can make appropriate adjustments.

The conditions for the developer of the Henan Refuge Room Door to deliver the house must be met when delivering the house in the new fire prevention code: legal conditions: 1. The developer should provide the Construction Project Completion Filing Form, household acceptance form, area report measurement report and indoor environment inspection report; the real estate development enterprise should obtain the Construction Project Completion Acceptance Filing Form when delivering the pre-sale commercial house; Obtain the technical report on the actual measurement of commercial housing area; Meet other delivery conditions agreed in the pre-sale contract. 2. The developer shall provide the Housing Quality Assurance Certificate and the Housing Operation Manual: the developer must provide the above two books when delivering the new commercial residential buildings for sale. supply Steel Grade A fireproof door If the developer cannot provide any of the above materials, the owner has the right to refuse to accept the house. Steel Grade A fireproof door Price Agreed conditions: 1. According to the house purchase contract, the developer shall fulfill the delivery commitment for water supply, power supply, heat supply, gas, communication, roads, greening and other supporting facilities when delivering the house, otherwise, the owner has the right to refuse to accept the house. 2. Other conditions agreed in the housing contract