
Henan fire door development prospects 1. The fire door industry is also an emerging industry, with huge market capacity and market potential. 2. Due to the high qualification threshold of fire doors, there are not many manufacturers that can really enter the fire door industry, but also Grade C fire doors Grade C fire doors Henan fire doors. According to incomplete statistics, there are more than 1000 fire door enterprises. major Class A fireproof window This does not include those family workshop type processing units. The products produced by these processing units are of different grades, with prices ranging from hundreds to thousands of yuan. 3. The market pattern in the industry has not been formed yet. There are few large enterprises and brands, and there is no leading brand. The research, development and production of fire door products have played a positive role in ensuring the safety of people's lives and property. China's fire door market started late, but developed rapidly. In recent years, some European and American enterprises have actively participated in the competition in the Chinese fire door market, especially European enterprises, which are trying to make European fire doors occupy more of the Chinese market. Class A fireproof window Price In the face of competitors, we must face up to the current situation. On the one hand, we should learn from our competitors modestly, and on the other hand, we should strive to enhance our own strength. Fire door manufacturers in China are facing a huge challenge. Who can seize the opportunity in this challenge will become a winner in the market.

Relevant requirements for fire protection of the door of Henan Refuge Room What kind of products are qualified when the door of Henan Refuge Room passes the fire protection? Here are some examples: 1. Filling materials: the filling materials must meet the requirements of combustion performance A1 specified in GB8624-2006. At the same time, it meets the requirements of smoke toxicity hazard classification ZA2 specified in GB/T20285-2006. 2. Material thickness: door leaf material shall be no less than 0.8mm, door panel material shall be no less than 0.8mm, door frame plate shall be no less than 1.2mm, hinge plate shall be no less than 3.0mm, reinforcement without screw holes shall be no less than 1.2mm, and reinforcement with screw holes shall be no less than 3.00mm. major Class A fireproof window The door of Henan refuge room 3. The adhesive shall meet the requirements of smoke toxicity hazard classification ZA2 specified in GB/T20285-2006. 4. Dimensional deviation: the height of the door leaf shall not exceed 2mm, the width of the door leaf shall not exceed 2mm, the thickness of the door leaf shall be between - 1mm and+2mm, the height of the clipping opening in the door frame shall not exceed 3mm, the width of the clipping opening in the door frame shall not exceed 2mm, and the width of the side wall of the door frame shall not exceed 2mm. 5. Geometric tolerance: the length difference between the two diagonals of the door leaf shall be less than or equal to 3mm, The distortion of the door leaf shall be less than or equal to 5mm, the curvature of the door leaf in the width direction shall be less than 2%, the curvature of the door leaf in the height direction shall be less than 2%, and the length difference between the two diagonals of the inner cutting opening shall be less than or equal to 3mm. 6. Fit tolerance: the overlap size between Manshan and the door frame is less than or equal to 12mm, the fit clearance between the door leaf and the door frame at the hinge side shall not be greater than the size tolerance specified in the design drawing, and the fit clearance between the door leaf and the door frame at the lock side shall not be greater than the size tolerance specified in the design drawing. Class A fireproof window Price The clearance between the door leaf and the upper frame shall be less than or equal to 3mm, the clearance between the double leaf and multi leaf door leaves shall be less than or equal to 3mm, the clearance between the door leaf and the lower frame or the ground shall be less than or equal to 9mm, the clearance between the binding surface of the door leaf and the side of the door frame with hinges shall be less than or equal to 3mm, the clearance between the binding surface of the door leaf and the side of the door frame with locks shall be less than or equal to 3mm, and the clearance between the binding surface of the door leaf and the upper frame of the door frame shall be less than or equal to 3mm, The plane height difference between the door frame and the door leaf is less than or equal to 1mm.

A brief talk on the problems encountered in the fire acceptance of Henan fire rolling shutter door 1. The curtain plate coating falls off and rusts, and the curtain plate has obvious pressure pits, concave convex, and penetrating holes. major Class A fireproof window The rolling shutter is a complete fire protection product. If the shutter has problems, it will directly affect the fire resistance limit index of the rolling shutter. 2. The guide rail is deformed and the curtain board is stuck or falls unevenly. The fireproof rolling shutter door generally moves along the guide rail. If the guide rail is twisted or broken, the rolling shutter door will not be able to move to the specified position, which will not achieve the effect of fire separation. 3. On the roller shutter, the lower limit fails or the limit line is wrongly connected. Class A fireproof window Price This often happens on the fire roller shutter of the atrium. Because the fire roller shutter of the atrium is sometimes installed outside the walkway of the upper floor, there is no floor under the roller shutter to close it, and a large gap is leaked, so the fire separation of the upper and lower floors cannot be reached.

Maintenance and cultivation of Henan fire rolling shutter All fire rolling shutters should be checked and tested once a week. The test content includes: fire rolling shutter escape function test. major Class A fireproof window After the fire roller shutter is in the linkage state and drops to the bottom, press any manual button on both sides of the fire roller shutter, and the fire roller shutter shall be able to rise to the limit position (or drop to the bottom again after a delay). The lifting, lowering and stopping test of the manual buttons on both sides of the fire shutter. The fire rolling shutter shall be able to operate according to the instructions, and the operation shall be stable without blocking, not to mention uneven running speed of the shutter, stacking of the shutter or derailment. Test of manual emergency device. The manual zipper is used to lift the fire shutter, and the manual quick release device is used to lower the fire shutter. The fire shutter shall operate smoothly. Simulate the fire signal for linkage test. It is required that the fire shutter should be able to descend according to the normal procedure, and the contents and parts displayed in the fire control room should be consistent with the actual situation. Check whether the sealing of fire shutter is intact and damaged. The inspection above Henan fire rolling shutter door shall be carefully recorded, and the problems found shall be solved in a timely manner without leaving hidden dangers. Check whether the appearance of the fire shutter is intact and whether the curtain surface is damaged. Henan fire shutter door The door leaf of Henan fire shutter door cannot move: sensor failure is the major cause of the fire shutter door leaf cannot move. When such a situation occurs, be sure to check whether the sensor signal light is normal. If it is not the fault of the sensor, it may be that the wire connector is loose, the belt falls off, the controller is burned, the foreign matter is stuck, the voltage is abnormal, and so on. Pay attention to check and eliminate them one by one. Class A fireproof window Price The door leaf of the fire rolling shutter jumps when opening and closing: the reason for this fault is very simple. If the track of the fire rolling shutter is jammed by foreign matters, it is necessary to check the tracks on both sides of the door leaf, remove the foreign matters, and the fault can be solved. The opening and closing speed of the fire shutter door leaf is too slow: customers often hear this situation. It may be that the speed adjustment of the national controller is too slow, or the belt is too loose, resulting in friction between the fire shutter door leaf and the guide rail. When handling, check these two parts. If the speed is too slow, adjust them faster. If the belt is too loose, tighten it in time.

Can the door of Henan Refuge Room be removed? According to Article 5.5.32 of the Code for Fire Protection Design of Buildings, for residential buildings with a building height of more than 54m, there should be a room that meets the following requirements: it should be set close to the external wall and should be equipped with an openable external window; The fire resistance limit of the inner and outer walls should not be less than 1.00h. The door of the room should be Class B fireproof door, and the fire resistance integrity of the outer window should not be less than 1.00h. major Class A fireproof window The total net width of each door, emergency exit, evacuation walkway and evacuation staircase of the residential building shall be determined by calculation, and the net width of the door and emergency exit shall not be less than 0.90m, and the net width of the evacuation walkway, evacuation staircase and the first floor evacuation outer door shall not be less than 1.10m. The clear width of the evacuation staircase with railings on one side of the residence with a building height of no more than 18m shall not be less than 1.0m. The relevant requirements of the Code for Fire Protection Design of Henan Refuge Room Door Buildings stipulate that: 1. Evacuation in buildings with Class I and II fire resistance rating] or the linear distance from any point in the auditorium, exhibition hall, multi-function hall, restaurant, business hall, etc. with no less than 2 emergency exits to the nearest evacuation] or the emergency exit shall not be more than 30m. 2. When the evacuation door] cannot directly connect to the outdoor ground or the evacuation staircase, an evacuation corridor with a length of no more than 10m shall be used to connect to the nearest emergency exit. Class A fireproof window Price When the place is equipped with automatic sprinkler system, the safe evacuation distance from any indoor point to the near emergency exit can be increased by 25%.

Control Procedure for Internal Quality Management System of Henan Refuge Room Door Manufacturer 1. Purpose To conduct regular internal quality audits to verify the quality activities and related results. Stone composite procedure documents: CCCF-HZFH-02 (A/O) Rules for the Implementation of Compulsory Product Certification, Fire Protection Products, Fire Resistant Components of Buildings and other quality documents, and take corrective measures in a timely manner, So as to make the quality management system operate effectively and ensure that the product consistency meets the requirements of relevant approval rules. 2. The scope is applicable to the audit of our internal quality management system. 3. Responsibilities: The quality director shall lead the internal quality audit work, and the audit team leader shall organize the internal quality audit work under the centralized management of the office, with the cooperation of each department. Henan Refuge Room 4. Procedure (1) Audit frequency The internal quality management system of each department shall be audited at least once a year according to the following procedures. major Class A fireproof window In case of major quality accident or other special reasons, the quality director shall decide to conduct targeted additional audit. (2) The Audit Planning Office shall propose the "Annual Internal Quality Management System Audit Plan" every year according to the actual situation and importance of audit activities, which shall be approved and implemented by the quality director. (3) Auditors The auditors shall have the qualification of internal auditors and have no direct responsibility for the audited activities, and shall be appointed by the General Manager. For the temporary additional audit, the quality director shall specify the audit team leader and auditors. (4) Before each audit, the office shall prepare the "audit schedule plan", which shall be approved by the person in charge of quality. The audit team leader reviews the documents and assigns tasks to the auditors, who prepare the audit checklist. (5) Audited department and audit schedule; Purpose, scope and basis of audit; Audit content and specific time arrangement; Division of auditors, etc. Class A fireproof window Price The audit schedule shall be sent by the audit team leader to the audited department one week in advance. After receiving the audit schedule, the audited department can notify the audit team leader in advance if there is any objection. After negotiation, it can make appropriate adjustments.